To their credit, the contactor returned again, later, March First with a magnet.
Hopefully all sharps are now gone.
Nuts! Still finding sharps. 2023.0301
Yikes! Found even more sharps today. 2023.0228
After clean up found sharps scattered where I usually park. 2023.0227
Day Four 2023.0227
No images submitted.
Intermission 2023.0226
Day Three 2023.0225
No images submitted.
Images by contractor. Day Two 2023.0224
Camera looking East.
Camera looking NE.
Chimney with flashing.
Center roof ridge.
Into roof ridge.
Along roof ridge.
Chimney.
Bathroom flapper vent.
Bathroom flapper vent hose connection.
End of First Day. 2023.0223
Images by contractor. Day One 2023.0223
Area around chimney needed new sheathing.
Dirty but dry.
Vapor barrier (white and blue) and
poly-iso insulation board (gray)
Two different plates:
3-inch insulation plates hold insulation down.
Smaller (2-3/8-inch) barbed plates grab membrane.
2-inch coated membrane screws into insulation/decking.
Overlaps heat welded (Leister welder 1100degF) and
rolled together.
PVC drip edge into gutter.
Needed: nibling to clean gutters!
60ml PVC membrane rolled out.
North side of roof looking West.
60ml PVC membrane rolled out.
North side of roof East end.
Materials delivered. Some assembly required.
Notes for contractor
Property uphill from street. Access via steep driveway.
Compact car (center of frame) to be removed for roof work.
Camera looking West. South side of house.
Demolition of decks and connecting stairs scheduled to begin March 6th.
Railings -where present- should be considered merely decorative.
Camera looking West. North side of house.